MAI Mechanical Experience

Take a look at a small sampling of our commercial projects. For a more detailed listing of our projects, contact us to request our corporate resume.


Wheat Ridge High School Remodel 

Immediate takeover of a plumbing remodel from a defaulted previous plumbing subcontractor. We were contacted to assist in this time of need and immediately responded, correcting and completing large areas of public restroom remodel and installations allowing the general contractor to maintain a critical schedule.

Contract Amount: $85,000 +/- 


Jefferson County School District 

Five simultaneously constructed elementary schools and a bonded subcontractor project.

Coronado Elementary, Juchem Elementary, Governors Ranch Elementary, West Ridge Elementary & Ute Meadows Elementary

Complete exterior and interior plumbing systems. Commercial kitchens, grease interceptors, hot water generations, domestic and space heating (boiler and hydronic heating).

Bonded Total Subcontract: $2,200,000 +


Autowash One, Inc.

Complete interior plumbing system include underground reclaim, sand/oil tanks, piping equipment, hot water generation system with piping, storm drainage system and snow melt system.

Contract Amount: $165,000 +


Rebound Ranch Juvenile Detention Center

Complete interior plumbing system for a critical security, penal equipment and fixture installations. Extensive interior and exterior propane fuel piping system.

Contract Amount: $120,000 +


Petroleum Technology Center

Sewer ejection station/pump lift retrofit, complete plumbing system retrofit and upgrade including a high water alarm device. System modification following OSHA confined work space requirements.

Contract Amount: $20,000 + 


Costco Retail

New store that included significant interior systems, special waste, grocery and major commercial kitchen piping, grease interceptors, grease waste, indirect waste. A tremendous number of floor drains and sinks. Major natural gas and water distribution, boilers and refrigeration sleeving. The automotive area included sand, oil and trench drainage, compressed air systems, public restrooms and a roof drainage system. Project was performed on a fast track basis and was completed from the ground up in seven (7) months.

Contract Amount: $735,000 


University of California Irvine Campus (UCI)

Exterior utility, sanitary sewer, storm sewer, domestic water, fire lines and hydrants including site utilities with building sub-drains. Fourteen thousand three hundred and forty (14,340) lineal feet of combined piping serving new dormitory halls.

Contract Amount: $350,000 + 


Olive Garden Restaurant

Gourmet national restaurant and lounge franchise. Complete exterior and interior plumbing. Restaurant construction and plumbing installations within occupied multi-story downtown office/retail building.

Contract Amount: $65,000 + 


Century Medical Center

Six (6) story medical/technical structure including future tenant facility rough-ins and completion of commons area baths, etc. Coordinated installations for future medical tenant improvements.

Contract Amount: $220,000 + 