Project Area

Project Spotlight

Large mixed use design built plumbing systems to accommodate 335,000 square foot facility and five story, 202 unit residential apartment complex.

Read Full Spotlight >>

Quick Contact

Name:
Company:
Email:
Phone:
Message:
TypeCode:* Security Image

Hotel Hospitality Projects

MAI Mechanical Experience

Take a look at a small sampling of our hotel projects. For a more detailed listing of our projects, contact us to request our corporate resume. 


Residence Inn Hotel

Complete interior plumbing systems, domestic hot water generation, water softener and laundry systems to accommodate a one hundred and twenty four (124) suite hotel including gatehouse facilities.

Contract Amount: $540,000 +/-


The Timbers Hotel

Complete interior plumbing and heat (HVAC) systems for a one hundred and twenty four (124) suite upscale hotel, restaurant and convention facility.

“Design Build” project engineered for maximum cost value for Owner.

Contract Amount: $925,000 +/-


Trailhead Lodge

An eighty six (86) room, two (2) story 185,000 square foot concrete podium, underground parking facility with four (4) story lodge in a beautiful mountain resort community. Complete plumbing and mechanical condenser water heat pump system for this luxury resort. Plumbing systems included upscale clubhouse and spa resort facilities, steam showers, shower and locker rooms, large centralized heat exchangers and piping to accommodate eighty six (86) residential resort suites, significant exterior site plumbing systems, pool facilities, water and gas features and snowmelt system designed by Mai Mechanical Corporation. pool facilities, water and gas features and snow melt system designed by Mai Mechanical Corporation.

HVAC water source heat pump system consisting of two (2) 5 million BTU boilers, 150 ton cooling tower, and heat exchangers with significant hot water and condenser water systems to accommodate heat pump, potable water and snow melt systems. MMC designed and installed over 17,000 square feet of snowmelt systems coordinated closely with complicated colored/stamped concrete armoring landscape features.

Contract Amount: $4,198,000 +/- 


Tabor-Grand Hotel

A four hundred and twenty (420) unit luxury condominium development including complete interior and finish plumbing. Various exterior sewer/water utilities and connections, backflow prevention, etc. Project construction consisted of various types of plumbing systems applicable to code requirements. Metallic and non-metallic systems, hot water heat, flue venting and all fuel and gas piping. Entire project was fast-track with scheduling intricacies due to geographical location, labor shortages, etc.

Contract Amount: $2,000,000 +


Staybridge Suites Hotel

Complete interior and exterior finish plumbing for a six (6) level, post tension concrete, one hundred and fifty one (151) suite, full service hotel near Denver International Airport.

Contract Amount: $1,045,000 +/- 


Hampton Inn

Complete exterior and interior plumbing systems including sewage lift station modification and 20HP twin centrifugal discharge ejector.

Contract Amount: $350,000 +/-


For a more detailed listing of our projects, contact us to request our corporate resume.


Client list includes: